Case Studies, News

Birmingham New Road Bollard Upgrade in Dudley

Less energy, easier maintenance: TMP bollards on Birmingham New Road

On a busy road, replacing a damaged bollard involves more than the cost of a new product. There’s the crew, the traffic management and the disruption while work takes place. Choosing the right bollard – and the right foundation – can make the next visit much simpler.

That thinking sits behind a recent upgrade on Birmingham New Road in Dudley, where we supplied approximately 50 Evo-N RS traffic bollards with retention sockets for installation by Hilton Main Construction on behalf of Dudley Council.

The scheme involved removing existing bollard light boxes and replacing them with our non-illuminated, retro-reflective self-righting bollards. It brings together two practical benefits: removing the need to power the bollards and making future replacement easier.

A bollard upgrade for a busy route

Birmingham New Road forms part of the A4123 and carries busy daily traffic through the Black Country. On a route like this, highway products need to work hard – and maintenance needs to be straightforward.

Bollards provide essential guidance around junctions and other highway features, but their position can also leave them exposed to vehicle impacts. Resilience matters. So does having a practical way to replace a bollard if it is damaged beyond repair.

For this scheme, we supplied the Evo-N RS, pairing our rebound bollard with a retention socket installation.

Visibility without an electricity supply

Our Evo-N is a retro-reflective self-righting bollard, often shortened to RSRB. Its reflective surfaces return light from vehicle headlights towards the driver, providing visibility without an internal light source.

The bollard is designed to rebound after an impact and return to an upright position, helping it cope with the knocks that come with life on the highway.

Replacing the existing illuminated arrangement removes the electricity demand associated with lighting those bollards. It also removes the lamps and lighting components from the ongoing maintenance task.

For Dudley Council, that creates an opportunity to reduce running costs while retaining clear guidance for road users.

Retention sockets make the next replacement simpler

Even a resilient bollard can eventually need replacing. Planning for that at installation makes sense, particularly on a heavily used road.

The retention sockets supplied for Birmingham New Road allow bollards to be removed and replaced quickly. Where the socket and foundation remain serviceable, a replacement can be fitted without excavating and rebuilding the foundation.

That can mean less time working beside live traffic, less civil engineering work and shorter maintenance visits. It can also help reduce the traffic management required for replacement work – an important consideration for both maintenance budgets and the people using the road.

Looking beyond the installation

The Birmingham New Road scheme shows why a bollard upgrade is about more than what drivers see above ground.

The Evo-N provides a resilient, non-illuminated bollard, while the retention socket supports simpler replacement when it is needed. Together, they help address the everyday demands of maintaining a busy highway: energy use, repair costs and disruption.

We’re pleased to have worked with Hilton Main Construction for this Dudley Council scheme, helping put practical, long-term maintenance considerations at the heart of the installation.

Planning a traffic bollard replacement scheme?

Whether you’re replacing illuminated bollards or specifying products for new highway works, we can help you choose a bollard and installation method that suit the site.

Explore our Evo-N traffic bollard or get in touch with our team to discuss your project.

Bollards & RS Sockets

Buy Now >>

EVO-N Rebound Traffic Bollard

From: £169.72

A non-illuminated and passively safe bollard that's designed and independently tested to be fully compliant for use on the UK highway.

Bollard Builder
Use the options below to configure your perfect bollard.

This product has multiple variants. The options may be chosen on the product page

Traffic Bollard Retention Socket

£79.62

The TMP Retention Socket is the perfect foundation choice for bollards located in vulnerable areas that are prone to repeated knockdowns. Bollards can be installed and replaced in seconds, not only making it safer for the highway operatives but there are considerable traffic management and civils savings too!

  • 50x50 Retention Socket
  • Made from cast-iron
  • Fast and safe bollard installation and replacement
  • More cost effective than traditional foundations

Leave a Reply

Your email address will not be published. Required fields are marked *